Tower cranes are among the most important and expensive pieces of equipment on any major building project, but they also have the potential to be extremely dangerous if proper safety measures are not taken. While tower crane accidents are infrequent, they can lead to tragic and costly results, including reputation damage for the contractor.
Assembly-Disassembly process:
- PLANNING PHASE
- Location;
- Ground conditions;
- Base structure and anchor bolts;
- Tower height;
- Collar/tie locations;
- Force/load evaluations;
- Wind accommodations;
- Equipment and component lists, including the crane manufacturer, model number, pertinent radius and capacity details.
- ERECTING PHASE
- OPERATING PHASE
- DISMANTLING PHASE
” The dismantling procedure of a tower crane is usually the reverse of the assembly procedure. However, the heights involved and the interface with the newly built structure make the dismantling operation far more difficult and hazardous.”
Vakhtang Tediashvili, GCSG’s Director
კოშკურა ამწის მონტაჟი-დემონტაჟი
GCSG -ის მიერ შეთავაზებულ მომსახურებებში შედის ასევე კოშკურა ამწის მონტაჟი და დემონტაჟის სამუშაოები ნებისმიერი სირთულის ლოკაციაზე. ამწეები ერთ-ერთი ყველაზე მნიშვნელოვანი და ძვირადღირებული ტექნიკაა სამშენებლო ობიექტზე, მაგრამ ასევე შეიძლება ჩაითვალოს უკიდურესად საშიშადაც, თუ სათანადო უსაფრთხოების ზომები არ იქნება გათვალისწინებული, მისი სწორად მონაჟი/დემოტაჟის დროს.
მონტაჟი-დემონტაჟის პროცესი :
- დაგეგმვის ფაზა
- აღმართვის ფაზა
- საოპერაციო ფაზა
- დემონტაჟის ფაზა
“ეს არ არის მარტივი პროცესი. განსაკუთრებით მაშინ, თუ ობიექტი ხალხმრავალ დასახლებულ პუნქტშია. ამ სამუშაოს სწორად შესრულება მხოლოდ გამოცდილ პროფესიონალებს უნდა ანდოთ.”
ვახტანგ თედიაშვილი, GCSG-ის დირექტორი.